Lafasi Warehouse Painting & CoatingsA division of Lafasi Terrazzo & Coatings

Industrial coating services / NYC

Epoxy floor coatings

Short answerEpoxy floor coatings form a resin finish over properly prepared concrete. Suitability depends on slab moisture, adhesion, traffic and exposure, not just the desired color. Lafasi reviews NYC warehouse floors for contamination, joints and operational constraints before specifying preparation, repairs and a coating system with a defined return-to-service schedule.

Serving New York City · Queens · Brooklyn · Bronx · Manhattan · Staten Island

01

What the scope includes

Map coating areas, traffic lanes, slab transitions and joints. Identify forklift turning points, chemical exposure, washdown and any exterior or sunlit sections. The survey should distinguish a cosmetic refresh from a failed floor requiring removal and substrate repair.

02

Preparation comes before the finish

Remove weak or incompatible material and mechanically prepare the slab to the selected system's requirements. Assess moisture and contamination before application. Detail cracks and joints deliberately; coating over a moving joint does not stop the movement.

03

Choosing a coating system

An epoxy system may include primer, build coats, aggregate and a compatible protective finish. Film thickness, surface texture and chemical resistance must match use. Urethane cement or polished concrete may be more appropriate for some operating conditions.

04

What affects cost

Slab condition, removal of old coatings, moisture treatment, repairs, aggregate texture, coating build and phasing affect cost. Square footage alone cannot establish the preparation requirement or expected performance.

We quote from the actual conditions and agreed scope. We do not publish square-foot prices that hide preparation, exclusions or access requirements.

05

Downtime & return to service

Separate the published recoat time from foot-traffic, vehicle-traffic and chemical-service cure requirements. Slab temperature, humidity and ventilation influence scheduling. We agree which activities can restart at each stage using product-specific guidance.

06

Standards & job-specific requirements

Floor work needs dust controls and an occupied-site separation plan. New York's floor coating VOC category limit is 100 g/L; confirm the product classification and any fire-code requirements rather than assuming all epoxy products are interchangeable.

Sources
  1. OSHA 29 CFR 1926.1153 — respirable crystalline silica — Table 1 addresses walk-behind floor grinders: integrated water delivery or the manufacturer's dust collection system with 99% or greater filter efficiency and a filter-cleaning mechanism; indoors, a HEPA vacuum removes loose dust between passes.
  2. 6 NYCRR 205.3 — New York architectural coating VOC limits — Applicable category limits effective January 1, 2021 are expressed as grams of VOC per liter. Confirm category, formulation and applicable exceptions for the actual product.
  3. OSHA 29 CFR 1910.22 — walking-working surfaces — Keep walking-working surfaces clean, orderly and dry to the extent feasible, and free of hazards such as spills, leaks and corrosion.
  4. FDNY C-30 — flammable finishes — 2022 NYC Fire Code Chapter 24 addresses spray application, floor finishing and certain dual-component or Class I/II liquid brush/roller operations exceeding one gallon. Permits and C-30 personal supervision may be required; we confirm requirements per job.

How the work is sequenced

  1. Step 1

    Survey & scope

    Map coating areas, traffic lanes, slab transitions and joints. Identify forklift turning points, chemical exposure, washdown and any exterior or sunlit sections. The survey should distinguish a cosmetic refresh from a failed floor requiring removal and substrate repair.

  2. Step 2

    Prepare & isolate

    Remove weak or incompatible material and mechanically prepare the slab to the selected system's requirements. Assess moisture and contamination before application. Detail cracks and joints deliberately; coating over a moving joint does not stop the movement.

  3. Step 3

    Apply the specified system

    An epoxy system may include primer, build coats, aggregate and a compatible protective finish. Film thickness, surface texture and chemical resistance must match use. Urethane cement or polished concrete may be more appropriate for some operating conditions.

  4. Step 4

    Check & hand back

    Separate the published recoat time from foot-traffic, vehicle-traffic and chemical-service cure requirements. Slab temperature, humidity and ventilation influence scheduling. We agree which activities can restart at each stage using product-specific guidance.

Questions facility managers ask

What should we include in a epoxy floor coatings inquiry?

Send the facility area, approximate dimensions, photos if available, access restrictions and preferred work window. Slab condition, removal of old coatings, moisture treatment, repairs, aggregate texture, coating build and phasing affect cost. We confirm the scope after reviewing the conditions.

Can work be phased around an occupied warehouse?

A phased approach may be possible if stock, people and vehicle traffic can be safely separated from preparation and application. We review access, ventilation and workable handback zones before agreeing to a schedule.

Can you coat over the existing finish?

Remove weak or incompatible material and mechanically prepare the slab to the selected system's requirements. Assess moisture and contamination before application. Detail cracks and joints deliberately; coating over a moving joint does not stop the movement.

Which coating system should we specify?

An epoxy system may include primer, build coats, aggregate and a compatible protective finish. Film thickness, surface texture and chemical resistance must match use. Urethane cement or polished concrete may be more appropriate for some operating conditions.

When can the space return to use?

Separate the published recoat time from foot-traffic, vehicle-traffic and chemical-service cure requirements. Slab temperature, humidity and ventilation influence scheduling. We agree which activities can restart at each stage using product-specific guidance.

What standards apply to this work?

Floor work needs dust controls and an occupied-site separation plan. New York's floor coating VOC category limit is 100 g/L; confirm the product classification and any fire-code requirements rather than assuming all epoxy products are interchangeable.

Related

Request a site walk

Tell us about the building.

Share the surfaces, access limits and operating hours so we can discuss a workable scope. Rough numbers are fine; "not sure" is an acceptable answer for size and height.

(929) 399-9979

Prefer to talk now? Call the number above.

CallGet a quote