Lafasi Warehouse Painting & CoatingsA division of Lafasi Terrazzo & Coatings

Industries / NYC industrial facilities

Painting & coatings for food & beverage facilities

Short answerFood and beverage coating work needs a scope tied to cleaning, product protection and the exact use of each surface. Lafasi plans NYC warehouse and production-area painting around those conditions without claiming blanket food-safety certification. The selected products, preparation methods and shutdown plan must suit the facility's actual exposure and operational requirements.

Serving New York City

01

Understand the operation first

A dry packaged-goods warehouse and a wet production room can have very different demands. Separate storage, washdown, process-adjacent and temperature-controlled areas before comparing coating systems. Clarify whether any requested surface has direct product contact.

02

Preparation & protection

Protect stock and production equipment and define the separation needed during dusty or sprayed work. Review old coatings, moisture and cleaning residues. Do not assume a clean-looking surface is ready for a new resin system.

03

Specify the system & sequence

Discuss epoxy, urethane cement or other appropriate systems using actual product documentation. Define texture and cleaning expectations together. A surface that is hard to clean or poorly matched to exposure is not solved by adding an unsupported hygienic claim.

04

Questions for the survey

  • Is the area dry storage, wet processing or refrigerated space?
  • What chemicals, concentrations and temperature changes occur during cleaning?
  • Does any coated surface contact product?
  • Who approves product suitability and the shutdown conditions?
05

Requirements to confirm

Materials, application method and facility use determine which requirements apply. We confirm requirements per job and refer to the actual product documentation rather than promise universal compliance from a coating name.

Sources
  1. OSHA 29 CFR 1910.22 — walking-working surfaces — Keep walking-working surfaces clean, orderly and dry to the extent feasible, and free of hazards such as spills, leaks and corrosion.
  2. 6 NYCRR 205.3 — New York architectural coating VOC limits — Applicable category limits effective January 1, 2021 are expressed as grams of VOC per liter. Confirm category, formulation and applicable exceptions for the actual product.
  3. FDNY C-30 — flammable finishes — 2022 NYC Fire Code Chapter 24 addresses spray application, floor finishing and certain dual-component or Class I/II liquid brush/roller operations exceeding one gallon. Permits and C-30 personal supervision may be required; we confirm requirements per job.

Questions facility managers ask

How do you plan coatings for food & beverage facilities?

A dry packaged-goods warehouse and a wet production room can have very different demands. Separate storage, washdown, process-adjacent and temperature-controlled areas before comparing coating systems. Clarify whether any requested surface has direct product contact.

What needs to be protected during preparation?

Protect stock and production equipment and define the separation needed during dusty or sprayed work. Review old coatings, moisture and cleaning residues. Do not assume a clean-looking surface is ready for a new resin system.

How is the sequence agreed?

Discuss epoxy, urethane cement or other appropriate systems using actual product documentation. Define texture and cleaning expectations together. A surface that is hard to clean or poorly matched to exposure is not solved by adding an unsupported hygienic claim.

Can you guarantee an overnight handback?

No generic overnight promise is appropriate. Preparation, coating layers, product-specific cure conditions and the required service determine the schedule.

What should we include in a quote request?

Is the area dry storage, wet processing or refrigerated space? What chemicals, concentrations and temperature changes occur during cleaning? Does any coated surface contact product? Who approves product suitability and the shutdown conditions? Send the location, approximate size and preferred timeline as well.

Related

Request a site walk

Tell us about the building.

Share the surfaces, access limits and operating hours so we can discuss a workable scope. Rough numbers are fine; "not sure" is an acceptable answer for size and height.

(929) 399-9979

Prefer to talk now? Call the number above.

CallGet a quote