Lafasi Warehouse Painting & CoatingsA division of Lafasi Terrazzo & Coatings

Field notes / Practical guides

Warehouse painting & coatings glossary

Short answerThis glossary explains common warehouse painting and floor-coating terms in plain language, from adhesion and concrete profile to dryfall, pipe legends and return to service. Definitions help NYC facility teams compare scopes and ask useful questions. They do not replace a product specification, a site assessment or the full text of an applicable standard.

Serving New York City

01

Adhesion

The bond between a coating and the surface below it; cleanliness and preparation are central to it.

02

Aggregate

Graded particles included in or broadcast into a resin floor to create build or texture.

03

Ambient conditions

The surrounding air temperature, humidity and other environmental conditions during work.

04

ASME A13.1

A pipe-identification scheme using a lettered legend, flow arrows and supporting color identification.

05

Bollard

A post intended to protect or separate an area; painting it is distinct from evaluating its structural adequacy.

06

Broadcast system

A resin floor system in which particles are distributed into a wet coat before subsequent specified work.

07

Coating compatibility

The ability of an existing and proposed coating to work together without unacceptable failure.

08

Condensation

Moisture forming on a surface; it can interfere with application and create walking hazards.

09

Concrete profile

The texture created in a slab surface to suit the intended coating system.

10

Containment

The separation and protective measures used to limit dust, debris or overspray movement.

11

Cure

The process by which a coating develops its intended properties; dry to touch does not mean fully cured.

12

Deck

The overhead deck surface in a building; its substrate and condition determine preparation.

13

Densifier

A treatment used with suitable concrete to react with the surface; it is not the same as a thick resin coating.

14

Dew point

The temperature at which air moisture can condense; product instructions define acceptable application conditions.

15

Dryfall

A coating formulated so overspray can dry before landing under specified application conditions.

16

Dry film

The coating left on a surface after the specified drying or curing process.

17

Efflorescence

Visible salt deposits associated with moisture movement through masonry; painting alone does not resolve the moisture source.

18

Epoxy

A family of reactive resin coating materials; performance depends on formulation, build and installation conditions.

19

Feather edge

A tapered transition at the edge of a prepared or repaired area.

20

Film build

The specified thickness of an applied coating system.

21

Flow arrow

A pipe marker element indicating the direction of flow; it supports clear system identification.

22

Galvanized steel

Steel with a zinc protective layer; coating over it requires a compatible approach.

23

Grinding

Mechanical removal or refinement of a concrete surface using appropriate equipment and exposure controls.

24

HEPA vacuum

A high-efficiency filtered vacuum; OSHA Table 1 calls for one between indoor walk-behind grinding passes.

25

Honeypot

A form field hidden from ordinary visitors to help identify automated spam submissions.

26

Industrial Business Zone

A city-designated industrial area; a neighborhood service name alone does not establish a parcel's IBZ status.

27

Joist

A structural framing member that may be included in an exposed overhead painting scope.

28

Legend

The written identification on a pipe marker; color alone is not the primary identifier.

29

Line striping

Application of approved lines and symbols to support a facility's traffic and zone plan.

30

Masking

Protection applied to surfaces or equipment that must not receive preparation debris or coating.

31

Moisture assessment

Evaluation of slab or environmental moisture before selecting and applying a floor system.

32

Overspray

Sprayed material that travels beyond the intended application surface.

33

Phasing

Dividing a project into agreed work and handback zones around operational constraints.

34

Polished concrete

A concrete finish produced through progressive mechanical refinement of a suitable slab.

35

Pot life

The usable working period for a mixed material under its specified conditions.

36

Primer

A preparatory coat selected for the substrate and subsequent coating system.

37

Recoat window

The product-defined interval in which a subsequent coat can be applied under stated conditions.

38

Return to service

The point at which a specified use can resume; foot, vehicle and chemical service may differ.

39

Sealer

A protective concrete or masonry treatment; different sealer types have different performance and maintenance needs.

40

Substrate

The underlying material to which preparation and coating are applied.

41

Surface preparation

Cleaning, removal, profiling and repair work needed before a coating system is applied.

42

TCPA consent

The explicit contact permission requested on our form; it is recorded with the submitted request.

43

Urethane cement

A resinous cementitious floor system considered for some demanding exposure and thermal conditions.

44

VOC

Volatile organic compound; regulatory coating limits depend on the product category and applicable rule.

45

Technical references

Where a term refers to a rule or standard, consult the linked source and confirm its applicability to the job.

Sources
  1. ASME A13.1 — identification of piping systems — The A13.1-2020 scheme uses the lettered legend and flow arrows as primary identification, with colors supporting the identification of pipe contents.
  2. OSHA 29 CFR 1926.1153 — respirable crystalline silica — Table 1 addresses walk-behind floor grinders: integrated water delivery or the manufacturer's dust collection system with 99% or greater filter efficiency and a filter-cleaning mechanism; indoors, a HEPA vacuum removes loose dust between passes.
  3. OSHA 29 CFR 1910.22 — walking-working surfaces — Keep walking-working surfaces clean, orderly and dry to the extent feasible, and free of hazards such as spills, leaks and corrosion.
  4. 6 NYCRR 205.3 — New York architectural coating VOC limits — Applicable category limits effective January 1, 2021 are expressed as grams of VOC per liter. Confirm category, formulation and applicable exceptions for the actual product.
  5. NYCEDC — industrial and manufacturing — New York City has 21 designated Industrial Business Zones. Neighborhood names used here are service-area descriptions, not a determination of an individual parcel's IBZ status.

Questions facility managers ask

Is dry to touch the same as cured?

No. A coating can feel dry before it has developed the properties needed for traffic, cleaning or chemical service.

Is grinding the same as polishing?

No. Grinding can remove material or establish a profile; polishing progressively refines a suitable slab for a particular finish.

Is a sealer the same as an epoxy floor?

No. A sealer treatment and a resin floor assembly can differ in build, preparation, performance and maintenance.

Is pipe color enough to identify a system?

No. In the supplied A13.1 scheme, the lettered legend and flow arrows are primary identifiers. Contents must be confirmed before marking.

Can the glossary replace product instructions?

No. Application conditions, preparation, recoat and service-release instructions must come from the actual specified system.

Related

Request a site walk

Tell us about the building.

Share the surfaces, access limits and operating hours so we can discuss a workable scope. Rough numbers are fine; "not sure" is an acceptable answer for size and height.

(929) 399-9979

Prefer to talk now? Call the number above.

CallGet a quote